Migration · Hadoop, data warehouse, Synapse, Snowflake

Migration to Databricks, step by step.

We replace Hadoop clusters, classic data warehouses and on-premises servers with a lakehouse platform on Databricks – in stages, while your reporting keeps running. For companies across Europe.

Principle

Build in parallel, compare, switch over.

The old solution keeps running while the new platform is built next to it. We only switch over once the business units see the same figures on both sides.

Migration – parallel runReconciliation running
SAPDatabasesAPIsSharePointKafka
↓
Before · keeps running
HadoopClusters and load jobs
Data warehouseSQL Server, Oracle, SAP BW
On-premises serversDatabases, files, scripts
=Figures being
reconciled
New · Databricks
BronzeRaw data, archived
SilverCleansed, typed
GoldKPIs, business models
↓
Power BILookerTableau
Switch-over after sign-off by the business unitsUnity Catalog · IaC · CI/CD
Starting point

Where we migrate from.

01

Hadoop

We replace clusters and their load jobs with ETL/ELT pipelines on Databricks – as we did for an e-commerce company on Google Cloud.

  • Inventory of the existing jobs
  • New pipelines instead of a 1:1 copy
  • Training for developers and business units
02

Classic data warehouses

SQL Server, Oracle or SAP BW: data model, historisation and load processes move into the lakehouse.

  • SQL Server and Oracle
  • SAP BW and SAP sources
  • Data warehouse in the lakehouse, based on Data Vault 2.0 if wanted
03

Cloud platforms

Azure Synapse or Snowflake no longer fit? We assess what a switch would bring and carry it out.

  • Azure Synapse
  • Snowflake
  • Decision paper before the first step
04

On-premises servers and databases

From on-premises to the cloud: relational databases of any kind, file servers and home-grown reports.

  • Relational databases
  • Files and exports
  • Azure, AWS or Google Cloud as the target
05

Interfaces and business systems

What is fetched by script or by hand today runs as a monitored pipeline afterwards.

  • APIs of ERP, CRM and business applications
  • SharePoint
  • SAP, for example via SAP Datasphere
06

Streaming

Event data from Kafka and other streaming sources lands directly in the lakehouse, next to the batch data.

  • Kafka and other streaming sources
  • Batch and streaming on one platform
  • One permissions model
Process

How a migration works.

01

Inventory

Which sources, load processes and reports exist, what is really used, what can go? The result is a list, not a gut feeling.

02

Target architecture

A decision paper with alternatives, risks and costs. You decide based on facts before anything moves.

03

Parallel build

The new pipelines are built next to the old solution. The business units compare the figures until they match.

04

Switch-over and handover

We switch over once the business units have signed off. Code, documentation and knowledge belong to you.

Scope

What moves with it.

01

Pipelines

Load processes as ETL/ELT pipelines with schedules, dependencies and restart.

02

Data model

Tables, historisation and metrics – cleaned up instead of copied one to one.

03

Permissions

Roles and access in Unity Catalog, traceable for business units and auditors.

04

Reports

Power BI, Looker or Tableau read from the new platform without the figures changing.

05

Operations

Environments and deployments from code: Terraform, Databricks Asset Bundles, Azure DevOps or GitHub Actions.

06

Knowledge

Training for developers and business units so your team develops the platform further itself.

The managing director's project experience

Three migrations, three starting points.

E-commerce

From Hadoop to Databricks on GCP

Implementation lead for infrastructure, governance, Unity Catalog and permissions, ETL/ELT pipelines replacing the Hadoop jobs, training for developers and business units.

  • Role: lead data engineer
  • Databricks on Google Cloud, Unity Catalog
  • Looker, Tableau
Mobile network services provider

From on-premises to the Azure cloud

Replacement of the local solution with a cloud architecture on Azure Synapse and Databricks, close support of internal staff during design, implementation and migration.

  • Role: consultant, data engineer
  • Azure Synapse Analytics
  • Databricks
Grid operator group

Move to the group platform

Migration of existing data acquisition processes to the enterprise-wide platform, data warehouse based on Data Vault 2.0, permissions concept with Unity Catalog, connection of SAP sources.

  • Role: lead data engineer
  • Azure Databricks, Unity Catalog, Data Vault 2.0
  • SAP Datasphere, SAP EAM, SAP S/4, Power BI

We do not name customers. All projects and the team are on the About us page.

Microsoft Fabric

When the target is Microsoft Fabric.

For Power BI-oriented teams, Fabric is often the better target. We migrate Excel and Access reporting, Azure Data Factory and Synapse to Fabric – we have done this for a food franchise and a metering services provider.

Getting started

Check first, then migrate.

You already have a Databricks platform and doubt whether it will hold? Then the Databricks health check is the right first step: three days, written report, billed by time and materials with an estimate up front. To the health check →

FAQ

Frequently asked questions about migration

Does our reporting keep running during the migration?

Yes. We build the new platform in parallel to the old one. We only switch over once the business units have compared the figures and signed off.

How long does a migration to Databricks take?

That depends on the number of sources, load processes and reports. After the inventory you receive a plan in stages with an effort estimate for each stage.

Which source systems do you connect?

Relational databases such as SQL Server and Oracle, SAP systems, Snowflake, APIs of ERP and CRM systems, SharePoint, files and streaming sources such as Kafka. If your system is missing from the list, ask us.

Do permissions and reports move as well?

Yes. We map roles and access in Unity Catalog. We connect reports in Power BI, Looker or Tableau to the new platform and reconcile the figures with the old state.

Do you work for companies outside Germany?

Yes. We deliver data projects across Europe, mostly remotely and in German or English.

What does a migration cost?

We bill by time and materials; you receive the rate and an estimate after the inventory. A fixed price is possible for clearly scoped packages.

Intro call

Let's talk about your migration.

30 minutes are enough to clarify starting point and target – and whether we are the right people for it.